Upgrade of water storage and filtration systems at kancoona site.

Installation of new storage tanks and additional pipe work, all stainless steel pipe work was all purged welded to food grade requirements.

Related posts

Allen’s Logging

Allen’s Logging

Installation of side buff rails on excavator to pretext the machine from the harsh conditions that are faced in the logging industry.

Posted
Tag Along Trailer

Tag Along Trailer

The construction of a tag along trailer, built from the ground up, for the back of a tipper truck, which is used to carry earth moving...

Posted