Previous item Tag Along Trailer Next item Carter Holt Harvey’s Major... Upgrade of water storage and filtration systems at kancoona site. Installation of new storage tanks and additional pipe work, all stainless steel pipe work was all purged welded to food grade requirements.
Allen’s LoggingInstallation of side buff rails on excavator to pretext the machine from the harsh conditions that are faced in the logging industry. Posted 26 March 2018 More 0
Tag Along TrailerThe construction of a tag along trailer, built from the ground up, for the back of a tipper truck, which is used to carry earth moving... Posted 26 March 2018 More 0
Carter Holt Harvey’s Major UpgradeSupplying of labour and equipment to assisted in the installation of machinery for their new plywood manufacturing facilities at Myrtleford. Posted 26 March 2018 More 0