Savaterre wines – stage one of construction of a storage and wine processing area.
This job required a redesign of the architect drawing to engineering standard drawings because the building needed to be able to withstand extreme winds. This was out sourced by GSM Engineering.
GSM Engineering involved in the project managing and steel fabrication of this project which required organise all the subcontractors for the project.