Savaterre wines – stage one of construction of a storage and wine processing area.

This job required a redesign of the architect drawing to engineering standard drawings because the building needed to be able to withstand extreme winds. This was out sourced by GSM Engineering.

GSM Engineering involved in the project managing and steel fabrication of this project which required organise all the subcontractors for the project.

Related posts

Allen’s Logging

Allen’s Logging

Installation of side buff rails on excavator to pretext the machine from the harsh conditions that are faced in the logging industry.

Posted
Tag Along Trailer

Tag Along Trailer

The construction of a tag along trailer, built from the ground up, for the back of a tipper truck, which is used to carry earth moving...

Posted
Mountain H2O

Mountain H2O

Upgrade of water storage and filtration systems at kancoona site. Installation of new storage tanks and additional pipe work, all stainless steel...

Posted